how to get building plan sanction in Hyderabad municipal corporation

RA Asked by Rahul Saxena from India

Quick Answer

To obtain a building plan sanction in Hyderabad, one must follow a systematic process outlined by the Greater Hyderabad Municipal Corporation (GHMC) under the provisions of the Hyderabad Municipal Corporation Act, 1955, and the relevant building bye-laws. The steps to get a building plan sanction are as follows:Preparation of Building Plans: Hire a qualified architect or a licensed engineer to pre

Detailed Legal Analysis

To obtain a building plan sanction in Hyderabad, one must follow a systematic process outlined by the Greater Hyderabad Municipal Corporation (GHMC) under the provisions of the Hyderabad Municipal Corporation Act, 1955, and the relevant building bye-laws.

The steps to get a building plan sanction are as follows:

  • Preparation of Building Plans: Hire a qualified architect or a licensed engineer to prepare the building plans. The plans must comply with the local zoning laws, building bye-laws, and other applicable rules.
  • Application Submission: Submit the application for building plan sanction along with the following documents to the GHMC:
    • Completed application form (available at GHMC offices or online).
    • Site plan showing the boundaries of the plot and adjoining properties.
    • Building plans including floor plans, elevations, and sections.
    • Land ownership documents (such as title deed or sale deed).
    • Encumbrance certificate for the property.
    • Non-objection certificates (NOCs) from relevant authorities, if applicable (e.g., Fire Department, Pollution Control Board).
  • Payment of Fees: Pay the requisite fee for the application. The fee structure is based on the built-up area and is detailed in the GHMC’s fee schedule.
  • Scrutiny of Application: Upon submission, the GHMC will scrutinize the application and the submitted documents for compliance with statutory requirements.
  • Site Inspection: An official from GHMC may conduct a site inspection to verify the details provided in the application.
  • Approval and Sanction: If the application meets all the requirements, the GHMC will issue a building plan approval. This approval is generally valid for a specific period (usually three years) within which construction must commence.
  • Commencement of Construction: After obtaining the sanction, the construction can begin as per the sanctioned plans. It's important to ensure that any modifications during construction are reported to the GHMC.
  • Final Approval: Once the construction is complete, apply for a completion certificate to obtain the final approval from GHMC.

Relevant provisions for these processes can be found in:

  • Hyderabad Municipal Corporation Act, 1955.
  • Building Bye-Laws of GHMC.
  • And other applicable local laws and regulations.

It is advisable to consult with legal experts or professionals familiar with local regulations to ensure full compliance throughout the process.